Year 2023
Type Industrial insulation: pipelines

Industry: Energy

Country: Latvia, Riga

Year of implementation: August – November 2023

 

Task:

  • lining of two furnaces of the SAX-24 biomass boiler at the Rigas Bio Energia thermal power station for the Elektrenu Energetikos Remontas UAB.

 

Implementation

During the project implementation, the following work was carried out:

  • welding of anchors in the amount of 8500 pieces;
  • fireproof insulation in a volume of 34 m3;
  • installation of refractory concrete with a total weight of 318 tons;
  • drying of 2 furnaces using our company’s equipment;
  • shotcreting using ALIVA-237 and ALIVA-257 equipment.

20 Inventum Polska specialists took part in the project.

 

Result:

  • the work was carried out professionally;
  • in compliance with technical requirements;
  • within the established time limit;
  • we received a recommendation letter from the Elektrenu Energetikos Remontas UAB based on the results of the work performed.