Year 2024
Type Industrial insulation: pipelines

Industry: Energy

Country: Poland, Poznań

Year of implementation: November - January 2024/25

 

Task:

  • to perform insulation work on industrial pipelines in the engine room of a combined heat and power plant with an area of ​​approximately 1,800 m2 in Poznań

 

Implementation:

Our specialists performed a number of insulation works:

  • installation of 80-100mm thick mineral wool insulation;
  • installation of an aluminum sheet casing (1050A);
  • installation of sheet metal flashings.

The installation works, including the construction of the structure, installation of mineral wool and installation of sheet metal, were carried out by our team of 6 qualified employees.

 

Results:

The work was carried out in accordance with high quality standards, in accordance with technical requirements, within the established deadlines and taking into account the individual expectations of the client.