Year
2023
Type
Industrial insulations: tanks and reservoirs
Industry: Energy
Country: Poland, Sanok
Year of implementation: June-August 2023
Task:
- installation of biomass boiler lining with a capacity of 7 MW at the Sanockie Przedsiębiorstwo Gospodarki Komunalnej Sp. z o.o. thermal power station.
Implementation
During the project implementation, the following work was carried out:
- installation of refractory bricks with a total weight of 9.2 tons;
- installation of refractory concrete with a total weight of 4.2 tons;
- fireproof insulation in a volume of 21 m3.
8 Inventum Polska specialists took part in the project.
Result:
- the work was carried out professionally;
- in compliance with technical requirements;
- within the established time limit;